The Alat-Osmanli-Astara railway is planned to be reconstructed, Trend reports.
This issue has been reflected in the “Action Plan for 2024-2026 to increase the transit potential of international transport corridors passing through the territory of the Republic of Azerbaijan and to stimulate transit cargo transportation” approved by the President of the Republic of Azerbaijan Ilham Aliyev.
Additionally, the document has reflected plans to complete work on overhaul of traction tracks and switches in the sorting yard of the Balajari station, capital repair of the Bash Alat railway station, reconstruction of the contact network and microprocessor communication-signal system on the Balajari-Yalama railway line, reconstruction of the power supply system for the Baku-Boyuk Kasik railway line, reconstruction of the microprocessor communication-signal system on the Ujar-Baku section, capital repair of 38 switches and seven arrival-departure tracks on the Yevlakh-Boyuk Kasik section.
Source: Trend News Agency